Wilderness area. Military operations area. Restricted airspace.
stalling at higher-than-normal airspeed. a longer takeoff run. difficulty in recovering from a stalled condition.
August 31, 2021. August 12, 2021. August 31, 2020.
must be made immediately to the NTSB. must be made within 10 days to the FAA. is not required.
1 calendar month. 7 days. 14 days.
Yes, it will cost $5 per aircraft. They don’t need to, your aircraft are already registered and your pilots are certificated. No, they will have to obtain operating authority from the Department of Transportation.
ensure the sUAS is equipped with a parachute ensure that the human beings who are not participating in the operation are under a covered structure or inside a non-moving vehicle. make sure the area is closed or restricted-access.